
The municipal sports center has two pools of light and 11x 25x12 5,5m, covered pavilion of 640 m2, several bodybuilding and fitness rooms, four outdoor courts, locker rooms, massage rooms, 2 saunas, steam bath and one space social and administrative.
The center already had an installed • installation of air conditioning, hot water production and heating the pool water.
• install new facilities replace the air conditioning installations relating to the gym and rooms have their origin in a heat recovery chiller plant that feeds air conditioners to four tubes 7.
The heat recovery chiller plant is sent to the post-heating of the batteries and air conditioners exceeded in the case of heat (in periods of low demand for air conditioning heat) is used for heating the water swimming pools and hot water. If you can not take this heat is dissipated to the atmosphere through a heat sink.
Automatically translated with Google Translate API.